
11 Oct Driveway
Driveway installation Hayling Island
Standard block pavers; solid sub base; raised edge; — completed within 5 days
Client required an old gravel driveway to be removed and disposed of, with a new block driveway laid to herringbone pattern.
The area was reduce dug to the correct levels with all waste mucked away in a timely fashion. Correct depths of sub base, levelled and compacted at multiple passes. Weed membrane separation layer installed. Sand layer compacted. Final block paver layer installed.
No Comments